By Myrtle Beach Senior Advisor Care Team · September 2, 2026
All 25 senior-serving community residential care facilities in Horry and Georgetown counties fall under Regulation 60-84, Section 1401's coastal rule: each must keep a written evacuation plan, a signed sheltering agreement, and at least one sheltering facility in a county that is not on the coastal list. Families may read the plan on request, and they should before signing a contract.
Why the Grand Strand gets a stricter rule
South Carolina's assisted living regulation names six coastal counties: Beaufort, Charleston, Colleton, Horry, Jasper and Georgetown. Any CRCF located in one of them must name at least one sheltering facility outside all six. The reasoning is simple. A storm big enough to force an evacuation of Myrtle Beach is likely to threaten Charleston and Beaufort too, so a plan that moves residents from Murrells Inlet to a sister building near Charleston or Beaufort does not really move them out of harm's way.
On the Grand Strand the rule reaches every licensed building, including those well inland. A CRCF in Conway or Loris sits 15 to 25 miles from the beach, but it is still in Horry County, so it needs the same inland sheltering arrangement as an oceanfront community. That matters because inland Horry has its own flood history, most memorably along the Waccamaw River after Hurricane Florence in 2018.
The three parts of a plan
Section 1401.B divides the plan into three pieces. The sheltering plan lists the building's licensed beds and usual occupancy, names the sheltering facility with its address and phone, and attaches a signed letter of agreement saying how many residents the shelter can take and how sleeping, meals, medications and staff space will work. That agreement has to be renewed at least every three years.
The transportation plan says what vehicles will be used, who supplies drivers, what medical support travels with residents, how food, water and medications are carried, roughly how long the trip takes and which primary and secondary routes the driver will use. The staffing plan explains who goes with residents and how they are relieved over several days.
What to look for when you read one
Start with the shelter itself. Is it another licensed care facility, a hotel, a church or a sister community owned by the same company? Is it in Marion, Florence, Dillon, Williamsburg or farther inland, and how long would the drive take with evacuation traffic on U.S. 501 or S.C. 22? Ask when the agreement was last signed and whether the shelter has actually received residents before.
Then look at transport. A building with 100 residents and two vans needs outside buses or ambulances, and every other facility on the coast will be calling the same companies. Ask whether contracts exist and how residents who use wheelchairs or need oxygen will travel. Finally, ask about medications: who packs them, who gives them on the road and at the shelter, and how records travel.
After the storm passes
Regulation 60-84 requires a building to report a disaster that displaces residents to DPH right away and in writing within 72 hours, and to send DPH a list of relocated residents and where they went by the next workday. It does not require the building to call each family, though good operators do. Ask how families were told where residents were during the last evacuation order and whether the building uses texts, a phone tree or a web page.
Ask, too, what happens if residents shelter in place rather than evacuate, as many buildings do for weaker storms. Section 1403 requires a plan for keeping essential services running through power outages, water shortages and staff who cannot get to work. Generators, fuel, food and water for several days, and staff who can sleep on site are the questions to cover.
How we handle the plans in our directory
DPH does not publish evacuation plans, so our directory cannot show them. What every assisted living page does show is the building's county, which here always triggers the inland rule, and a short list of questions drawn from Section 1401. Take that list on your tour, read the plan in the office, and note the shelter's name and town.
If a building is reluctant to show its plan, remember that the regulation gives residents and responsible parties the right to inspect it. A calm, specific answer to these questions is one of the best signs that a building takes the rest of its obligations seriously, too.
A short checklist for your tour
Bring five questions and write down the answers. Where is the inland shelter, and is it a licensed care facility? When was the sheltering agreement last signed? Which vehicles carry residents, and are there contracts for buses or wheelchair vans? Who travels with residents, and how long can staff stay at the shelter? How will the building contact you, and how often, from the moment an order is issued until residents return?
Compare the answers across buildings. Specific names, dates and phone numbers are a good sign; general reassurance is not. If a building has evacuated before, ask what went well and what it changed afterward.
Frequently asked questions
Can a family see the evacuation plan?
Yes. Section 1401 requires the plan to be available to a resident or responsible party on request.
Does the inland rule apply to buildings in Conway?
Yes. It follows the county, and all of Horry County is on the coastal list.
Do nursing homes follow the same rule?
Certified nursing homes follow the federal emergency preparedness rule at 42 CFR 483.73 and DPH's nursing home standards.
How often must the sheltering agreement be renewed?
At least every three years under Section 1401.B.
Can a building shelter evacuees above its licensed capacity?
Temporarily, if residents' safety is not compromised; the regulation allows that exception during a disaster.